AfnewsAfnewsAfnews
  • Home
  • Latest
  • National News
  • Top Stories
  • Politics
  • State News
  • Entertainment
  • Crime
  • Society New
  • Sports
  • More
    • World News
    • Editorial
    • Business
    • News
    • Opinion
Reading: Total closure of Third Mainland Bridge from midnight Saturday
Share
Notification Show More
AfnewsAfnews
Search
  • Home
  • Latest
  • National News
  • Top Stories
  • Politics
  • State News
  • Entertainment
  • Crime
  • Society New
  • Sports
  • More
    • World News
    • Editorial
    • Business
    • News
    • Opinion
Follow US
Afnews > Blog > News > Total closure of Third Mainland Bridge from midnight Saturday
News

Total closure of Third Mainland Bridge from midnight Saturday

chuks oti
December 22, 2020
Share

The Third Mainland Bridge in Lagos will be totally shut for 72 hours from midnight Saturday, Federal Controller of Works, Olukayode Popoola said.

The closure is to allow for casting of concrete on the expansion joints.

Popoola said that the shutdown will last till midnight on Tuesday.

Repair work on the bridge began late July and was to end in January.

The deadline has now been shifted till February, because of the #EndSARS protest.

Popoola said construction work had reached the stage for casting concrete on additional three expansion joints.

“There is going to be total closure of Third Mainland Bridge in order to allow for the casting of three number expansion joints on the Island Bound lane

” The effective date of the closure will be from 12:00 midnight of 25th of December. So people will be allowed to use the Third Mainland Bridge to celebrate Christmas.

“By the time the Christmas is winding down which is 12:00 midnight, we are going to close it so that we will be able to cast the concrete on Saturday the 26th and 27th we cast again.

” And we need about 72 hours for this concrete to set. Therefore, the opening will be on the 28th December midnight, that is 72-hour closure.

“This is to prevent vibration of the bridge. If we allow vehicles to be moving on one lane, there is going to be vibrations and the concrete will not set properly,”he said.

The controller said that all the alternative routes were in good condition and traffic regulatory agencies had been deployed to effectively divert and manage traffic to avert gridlock.

He appealed to road users to cooperate with traffic regulatory agencies.

Repairs on the bridge was initially divided into two phases of three months on each carriageway, starting with the Oworonsoki bound carriageway.

The work dragged into four months.

Traffic was partially diverted on a stretch of 3.5km where construction is ongoing between Adeniji Adeniji Ramp and Ebute Meta, while different time belts were allotted for traffic diversions on the bridge.

The 11.8km bridge is the longest of the three bridges connecting Lagos Island to the Mainland.

The bridge starts from Oworonshoki, which is linked to the Apapa-Oshodi Expressway and the Lagos-Ibadan Expressway and ends at the Adeniji Adele Interchange on Lagos Island.

Constructed in 1990, the bridge was adjudged as the longest in Africa until 1996 when the Oct. 6 Bridge in Cairo, Egypt was completed.

Related

Listen to top Radio Stations in Abia State CLICK HERE

Support Afnews Independent Journalism

At Afnews, we are dedicated to providing accurate, insightful, and timely news coverage. Our commitment to journalistic integrity ensures that you receive trustworthy information, unfiltered and unbiased. To maintain our independence and continue delivering quality content, we rely on the support of our readers.

If you value the work we do, please consider making a contribution. Your support enables us to keep bringing you the stories that matter.

Donate today and help us keep independent journalism alive. Thank you for your support!

MAKE A DONATION
DSS Is Denying Nnamdi Kanu Access To His Medical Records, Choice Visitors – Lawyer | READ MORE
How N20m Was Wasted On A 2-Classroom Block In Abia
Flood Sacks Residents in Sapele, Delta State
Killer Herders Will Stop Killing If They Hear From Buhari, Sultan of Sokoto – Benue Deputy Gov.
T0P STORY: Why 1st Class Graduates Should Be Granted Automatic Employment – Reps
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Telegram

RECENT EDITION

Recent Posts

  • 2027: Gov Fintiri gives reason for defecting to APC
  • Amupitan Appeals To NPC for Support To Rebuild Trust, Ensure Credible 2027 Elections –
  • Hope Uzodimma receives PDP defectors into APC in Imo
  • Fintiri declares self APC leader in Adamawa after defection
  • BREAKING: Protesters Storm U.S. Consulate Entrance in Karachi Over Iran Strikes, Security Forces Fire Tear Gas | WATCH VIDEO 
Popular News

OSINBAJO REVEALS HOW SARAKI WOULD HAVE TAKEN OVER PRESIDENCY, THANKS HIM FOR NOT DOING IT

Afnews Editor
Afnews Editor
May 30, 2019
Davido’s Visit Sparks Tension in Abia as Don Lulu, Enviable Boss Clash Over Alleged Diversion
ABIA STATE: ABROMA STAFF CRIES OUT OVER 29 MONTHS SALARY ARREARS, SAYS GM, GOVT INSENSITIVE TO THEIR PLIGHT
Nigeria’s Defence Minister clears air on granting US Forces permission to rescue citizen | READ DETAILS
Tobi Amusan Nominated For Women’s World Athlete Of The Year |SEE LIST
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
AfnewsAfnews
© Afnews Media. All Rights Reserved.
  • About
  • Advertise
  • Privacy & Policy
  • Contact
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?